Case Study
Priestlands School
Client Brief
Priestlands School, located in the New Forrest, approached for assistance in providing a new classroom facility, consisting of a total of four classrooms. The client requested a full turn key solution.
- CLIENT:
Priestlands School - LOCATION:
Lymington, New Forest - SIZE:
2 Storeys of 19m x 8.9m - SECTOR:
Education - TYPE:
Double Storey Modular - COMPLETION WITHIN:
12 Weeks - TME ON SITE:
5 Weeks
Key Facts
The Results
We used a pre-owned steel framed two storey modular building from our extensive range of stock that was the perfect size for the job. Working closely with the client we agreed the layouts required before starting refurbishment works here at our yard in Alton, Hampshire. We were able to deliver the building and complete all works, including a full groundworks package, on time and on budget. Priestlands School were extremely happy with the product and service provided.
Challenges We Faced
Due to the building being a two storey modular structure, we had to comply with Local Building Control and demonstrate that our design met all fire criteria. This brought many challenges to the project and we had to work very closely with the local fire officer to achieve final approval.
Before
After
Contact PF Modular
For more information on modular or portable buildings, please contact our expert team.